Wheatheart X13 1000RPM PTO User Manual

Browse online or download User Manual for Special machinery Wheatheart X13 1000RPM PTO. Wheatheart X13 1000RPM PTO User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 5
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
PART NUMBER: 30788 R1
R
EVISED: 23/11/12
We recommend that two or more people be present for this procedure.
Note: In this manual, left hand and right hand directions apply when looking at the boot
from the tow bar end.
Before starting installation:
Familiarize yourself with all the required hardware.
Arrange all parts for easy access.
Refer to the X13 assembly and operating manual for assembly safety and
operating instructions.
AUGER PREPARATION FOR KIT INSTALLATION
Note: When installing kit during assembly of a NEW auger, steps 1-10 may not apply.
1. Lower auger to full down position.
2. Chock auger wheels to prevent rolling.
3. Remove tractor from auger.
4. Lower swing hopper fully to the ground.
5. Support auger boot securely with front end loader and strong sling or chain,
or with block and tackle.
6. Remove PTO driveline from auger.
7. Loosen bolts and nuts, remove PTO saddle bracket from boot.
8. Remove sprocket guard from boot.
9. Remove sprockets, bearing, and lock collar from boot.
10. Loosen bolts and nuts, remove bearings and washer from boot.
Note: Don't remove the square keys from the flighting or top gearbox shaft. Make sure
there is nothing left on the boot face. See Figure 1.
X13 1000 RPM PTO DRIVE KIT [A262]
FOR X1374, X1384, & X1394 AUGER MODELS
INSTA
LLATION INSTRUCTIONS
Wheatheart
epart of th Ag Growth International Inc. Group
P.O. Box 39, Rosenort, Manitoba, Canada R0G 1W0 Ph: (866) 467-7207 Fax: (866) 768-4852
Website: www.wheatheart.com Email: sales@wheatheart.com
© Ag Growth International Inc. 2013
Page view 0
1 2 3 4 5

Summary of Contents

Page 1 - LLATION INSTRUCTIONS

PART NUMBER: 30788 R1REVISED: 23/11/12We recommend that two or more people be present for this procedure. Note: In this manual, left hand and right ha

Page 2 - INSTALLATION

2Figure 1 INSTALLATION See Figure 2, Figure 3, and Figure 4.Note: The gearbox has been filled at the factory (half full) with 75W90 synthetic oil (or

Page 3

36. Insert 1-1/4” short plug shaft into the upper hole in the gearbox. Secure with a set screw.Figure 2 1000 RPM PTO Drive Installation7. Insert 1-3

Page 4

4Figure 3 Installing PTO Transport Strap and Double Hose HolderNote: Support boot securely so that the tow bar can be repositioned.12. Remove the 3/4”

Page 5 - Figure 4 Installing Tow Bar

5Figure 4 Installing Tow Bar 17. Re-install PTO driveline to splined stub shaft in the gearbox using existing 3/8” x 1-3/4” square key and 3/8” roll p

Comments to this Manuals

No comments